top of page
  • The MAROMA platform is made up of 3 assets (consisting of 9 sections) with a total extension of over 550 km. These assets include ACSA (Durango - Torreón, Libramiento Norte de la Laguna, Libramiento de Cd. Juárez), ACOMEX (Toluca - Zitácuaro), and COINSAN (San Luis Potosí - Río Verde).

bottom of page